Mosen Ltd were appointed to undertake the tunnel ventilation and fire safety review for all 29 new stations being designed for the North-South Line Extension and Downtown Lines 2 and 3 of Singapore Metro.
The scope of works includes consideration of the permanent and temporary (construction) tunnel ventilation system, including a review of the design approach, assumptions, design calculations and computer simulations to ensure that the systems are safe, suitable and adequate.
Client: Land Transport Authority of Singapore